Testing and commissioning of the Moreton Bay Rail Link

​The Moreton Bay Rail Link includes:

  • 14 kilometres of double track rail from Lawnton to Kippa-Ring
  • 22 bridge structures to provide grade separation of road and rail, including over the Bruce Highway
  • 6 new rail stations including bus interchanges and bike storage
  • 2,850 carparks
  • Stabling (including train crew facilities) for 10 six-car trains in the vicinity of Kippa-Ring Station
  • 3 metre wide concrete shared access path for cyclists and pedestrians along the entire length of the corridor.

When the new line opens, the Rail Link and six new stations between Kallangur and Kippa-Ring will transform the Moreton Bay region by delivering:

  • More than 650 train services weekly for the Moreton Bay community, including 17 morning and 15 afternoon peak services each weekday
  • Trains every 6-12 minutes in the morning and afternoon peak periods
  • Clock-face departures every 30 minutes in off-peak and on weekends
  • Consistent 55-minute journey from Kippa-Ring to Brisbane Central.

Testing and commissioning program

In preparation for the line’s opening, Queensland Rail has been undertaking comprehensive testing on the line.

As part of this testing phase, Moreton Bay residents will notice trains running on the line as Queensland Rail tests the track and signalling infrastructure for safety and performance.

This testing will be undertaken mostly during the day. Testing may be required intermittently at night and on weekends, however nearby residents will be notified ahead of time.

For more information about the testing and commissioning program, click here (PDF | DOC).

Living near the rail corridor

Queensland Rail has a long and proud history of connecting communities right throughout the state. We pride ourselves on being a good neighbour and we work hard to minimise the impact of our operations on our neighbours wherever possible.

For more information about living near a rail corridor, click here (PDF | DOC).

More information

For more information, contact the project team by phone 1800 096 821 (select option 2) or email mbrl@qr.com.au

Notices

  • Works notice: commencement of testing and commissioning phase (PDF | DOC)
  • Works notice: Kippa-Ring station stabling facility (PDF | DOC)
  • Letter: Introduction to Queensland Rail (PDF | DOC)
  • Fact sheet: Living near a rail line (PDF | DOC)
  • Fact sheet: Testing and commissioning phase (PDF | DOC)
  • Fact sheet: Rail grinding (PDF | DOC)
  • Fact sheet: Resurfacing (PDF | DOC)